The Sync Progress bar provides the mobile users more detailed information on progress during a sync.
There are up to 13 steps to syncing:
- Checking for App Updates - checking for required upgrades.
- Recording geolocation - only capture if geolocations services are on and available.
- Processing Jobs - sending completed Jobs to Salesforce.
- Uploading Completed Jobs - confirming completed jobs sent to Salesforce.
- Downloading Jobs - Jobs assigned to user.
- Downloading attachments - any images to be displayed in the drill-down hierarchy.
- Downloading form mappings - connections from Forms to database.
- Downloading forms - downloading form details for input.
- Downloading score groups
- Downloading printing detail
- Downloading cascading selects
- Downloading media files - files for View Resource tasks
- Downloading performance data
Starting in TaroWorks 6.4, on step 3 you will see the percentage of Jobs processed. This is most commonly the longest step of your sync process.
Note: You will receive a sync error for Jobs that did not successfully sync to Salesforce.
In TaroWorks 7.4 cancellation confirmation pop-up
Comments
0 comments
Please sign in to leave a comment.